An educational Academy Trust commissioned us to produce accurate floor plans across several of its schools, supporting fire safety and accessibility compliance and applications for Department for Education (DfE) funding.

Project highlights

  • Measured building surveys of multiple schools across an Academy Trust, completed over consecutive days.
  • Latest handheld laser scanning technology used to capture complex, multi-building school sites.
  • Detailed capture of heating and cooling systems, internal plumbing fixtures, exposed beams and internal heights.
  • Surveys carried out in live school environments during the busy summer holidays.
  • 2D drawings in PDF and DWG formats that helped the Trust successfully apply for DfE funding.

The challenge

We were commissioned by an educational Academy Trust to produce floor plans of several schools within the Trust. The floor plans would be vital in ensuring the Trust’s legal compliance with fire safety and accessibility regulations, and in achieving its funding goals when applying for specialist funds and grants from the Department for Education (DfE). These can include the Condition Improvement Fund (CIF) and School Condition Allocations (SCA).

The Trust requested that we conduct the measured building surveys over consecutive days to reduce cost and shorten lead times. The sites often included multiple buildings with diverse architectural details and layouts, and the schools remained in active use over the summer holidays, creating the additional challenge of surveying in a busy environment.

The solution

To meet these requirements, we carried out a laser scanning survey using the latest handheld scanning technology. Using the scanners, we were able to measure the complex layouts of the schools and provide accurate area information to the Trust.

We also captured information such as the schools’ heating and cooling systems, all internal plumbing fixtures, exposed beams and all internal height dimensions.

We completed all surveys across multiple sites in a few days, meeting the time constraints requested by the client and reducing our lead times, travel time and, consequently, our carbon footprint.

The outcome

The client was provided with 2D drawings in both PDF and DWG formats. This gave the Trust an accurate foundation from which to apply for additional funding, helping it to ensure its heating infrastructure is sufficient and to prevent overcrowding.