Chelmer Valley School

Chelmer Valley School in Essex needed a measured building survey of multiple buildings across its campus, giving the Trust accurate drawings to support a funding application for improved heating infrastructure.

Project highlights

  • Measured building survey of multiple buildings across a large school site in Essex.
  • Four surveyors on site for two days, with an overnight stay to make the most of the working time.
  • Handheld laser scanning used to measure complex layouts and provide accurate area information.
  • Heating and cooling systems, internal plumbing fixtures, exposed beams and internal heights all recorded.
  • 2D drawings in PDF and DWG formats used by the Trust in its successful funding application.

The challenge

Our team was commissioned to undertake an extensive measured building survey at Chelmer Valley School in Essex. The project involved surveying multiple buildings across a large educational site, requiring comprehensive data capture to provide an accurate representation of the existing structures.

Due to the scale of the project, a team of four surveyors was deployed to site for a two-day survey, with an overnight stay arranged to maximise the available working time.

With numerous buildings to survey and a limited timeframe for completion, careful coordination and efficient data collection were essential to ensure all required areas could be captured.

The solution

To meet these requirements, we carried out a laser scanning survey using the latest handheld scanning technology. Using the scanners, we were able to measure the complex layouts of the schools and provide accurate area information to the Trust.

We also captured information such as the schools’ heating and cooling systems, all internal plumbing fixtures, exposed beams and all internal height dimensions.

We completed all surveys across multiple sites in a few days, meeting the time constraints requested by the client and reducing our lead times, travel time and, consequently, our carbon footprint.

The outcome

The client was provided with 2D drawings in both PDF and DWG formats. This gave the Trust an accurate foundation from which to apply for additional funding, helping it to ensure its heating infrastructure is sufficient and to prevent overcrowding.

We met the goal we set ourselves of providing the best outcome for both the client and the pupils within the Trust. Using the drawings we provided, the client successfully applied for funding.